The following vessels were used at
Utgrunden Wind Turbine Farm:
M/S Cable One:
1. Recovering of the existing cables.
2. Laying of the new cables.
M/B Silja:
1. Survey of the main cable and video documentation.
2. Transport of cable jointers, personnel and equipment
between the wind turbines.
Stf. Helle Saj:
1. Excavating of the trenches for the new cables.
2. Covering of the new cables.
M/S Honte:
1. Control of trenches and embedding of the cables.
2. Installation of the J-tubes to the wind turbines.
T/B Lille Bjørn:
1. Assistance for C/S Cable One during the laying of the cables.
2. Assistance for M/S Honte during the embedding of the cables. |