The following were used at
Arklow Bank Offshore Wind Park:
Vessel: C/S Cable One
Equipment:
Jetting unit (SUB-JET ONE), ROV and
measuring vehicle (MV1).
Approx. 14,000 metres of the main cable were
surveyed and approx. 500 metres of
the main cable were embedded into
the seabed. |