Pipelines
JD-Contractor A/S has both as main contractor and
subcontractor, carried out the laying, repairing and re-laying of
all types of pipelines. From oil- and chemical pipelines to waste
water outlets from water treatment plants and industries. We have
also had great success with delivery and installation of water-
and waste water pipes to many islands.
|
| Since 1981 JD-Contractor A/S has
had a service division which is solely concerned with carrying out
inspections of existing water treatment plants.
This division has throughout the years prevented several
damages.
READ
MORE... |
 |
| |
|
JD-Contractor A/S
has some of Scandinavia's largest high-pressure pumps,
which enable us to clean J-tubes, pipelines, and outlets of any
size and volume. Our equipment is attached to hydraulic derricks
and thus is capable of reaching 400 metres into a pipeline or other
object.
READ
MORE... |
 |
| |
|
| With our cable and lay barge Henry
P. Lading we are capable of laying out flexible pipelines
for water supply, ammonia, chemicals and oil. Besides our various
vessels for laying and embedding pipes. JD-Contractor A/S also has
a wide range of special equipment for assignments in connection
with pipelines, such as diamant wire cutting machines etc.
READ
MORE... |
 |
| |
|
| To several islands we have delivered
and installed pipes for both drinking water and
waste water. We have had great deal of success
in laying the two pipes in the same trench and with the same ballast
which has led to big savings for the main contractor.
READ
MORE... |
 |
| |
|
| JD-Contractor A/S has established
the first large lake restoration project in Furesøen.
Through a pipe system pure oxygen is transported to three diffusers
at the bottom of the deepest holes in the lake. The distribution
of oxygen will reduce the number of polluting sediments in the water,
including phosphor.
READ
MORE... |
 |
| |
|
JD-Contractor A/S was involved with the world’s
biggest submarine cable project.
As a part in Eltra’s big cable project from Aarhus to Aalborg,
a crossing of the Mariager fiord was carried out. About 700 metres
of cable were placed on the seabed. We are talking about a 400
kW lead-sheathed cable that is placed in a water-filled pipe on
the seabed of the fiord.
READ
MORE...
|
 |