LAYING POWER CABLES
YEAR
RUNNING METRES
ABB AB - Sweden:
 
145 kV High Voltage Export Cable to Rødsand 2 (Windmill Project)
2009
9,500
     
ABB-Electric A/S:  
Cable across entrance to Hvide Sande
1988
230
   
Canadien Renevable Energy Coorporation (CREC):  
Lake Ontarion, Canada
2008
8,000
   
Delpro A/S:
66 kV Power cable between Langeland and Ærø
2003
5,885
   
Eltra:
Six 400 kV & three 150 kV cables in nine cable pipes ID 355,
crossing Mariager Fjord
2004
9 x 650
   
Energinet.dk:  
60 kV (fase T) Bornholm between Denmark and Sweden
2010
2,486
400 kV HVDC submarine cable, Storebælt
2009
31,700
400 kV HVDC shore cable, Storebælt
2009
300
MRS cable(return cable), Storebælt
2009
32,000
Kontek: 3 repairs in Baltic Sea between Denmark-Germany
2008
80
Kontek: 1 repair in Baltic Sea between Denmark-Germany
2007
84
Kontek: 1 repair in Baltic Sea between Denmark-Germany
2006
56
   
Energi E2:  
Exchange of main power cable at Utgrunden Wind Turbine Farm, Sweden
2006
860
   
Energi-Midt A/S:  
Cable pipeline from Jutland to Fur
2006
956
   
Frederikshavn Elnet A/S  
12 kV power cable to Hirsholmene
2009
6,000
   
GE Wind Energy:
Six cables between 7 offshore wind turbines - Utgrunden, Sweden
2004
2,300
   
Global Marine Systems Ltd.:  
Submarine cables at Horns Rev Windmill Project
2002
14,043
   
Københavns Energi A/S:  
3 cables in one bundle (132 kV) in Port of Copenhagen
2009
975
   
Hoffmann A/S:  
Cable in Skagen Harbour
2005
66
   
M.K.F. Elforsyning, Middelfart:
10 kV submarine cable from Middelfart to Fænø  
500
   
Nexans Norway:
Installation of landing at the Horns Rev 2 (Export cable)
2009
4,342
Submarine cable to Horns Rev Windmill Project
2002
21,500
Assistance with pulling cables into J-tubes at Horns Rev Windmill Farm - depth 12 metres
2002
 
   
NKT-Cables A/S:  
Repair of power cable at Iceland, Westmanna
2008
1,000
Kontek: Repair of electrode Cable, Baltic Sea
2007
1,515
Submarine cables between Bornholm and Sweden (Central cable)
2006
4,314
Submarine cables between Bornholm and Sweden (Southwest cable)
2006
1,137
Kontiskan, Læsø (Repair)
2006
53
   
Ringkøbing County High Voltage Plant:  
Cable across the entrance to Hvide Sande
1991
230
   
SEAS-NVE:

3 cables for 132 kV, one conductor, with a cross section of 1600 mm2 and an outside diameter of 102 mm (Guldborgsund)

2008
1438

2 earth conductors of 95 mm2 with an outside diameter 14 mm
(Guldborgsund)

2008
1438
Cable pipelines (10 x PE ID 110) under Masnedsund
2007
235
   
Skive Municipality:
Power cable in Skive Fjord
1986
500
   
Stattnet SF:
Horton, Oslo Fjord, Norway (re-installation)
2008
8,000
Norned 450 kV: Waddensee, Netherland
2007
10,500

Norned (Pull in):
The work JD-Contractor A/S undertook in Norway consisted of lifting the laid cable up off the seabed and carefully pulling it through a tunnel, 50 metres under water. With the aid of a winch the cable was pulled 140 metres through the tunnel before it reached the shore.

2007
 
Norned Kp 47 (Jointing):
Statnett requested us to take over the engineering, planning and supervising of the operation.
2007
 
Vestkraft I/S:
60 kV submarine cable between Esbjerg and Fanø
1989
4,000
60 kV submarine cable in Ringkøbing Fjord
1985
600
   
Østkraft:  
Bornholm-Sweden, NE cable Denmark-Sweden
2005
3,162
   
LAYING COMMUNICATION CABLES
YEAR
RUNNING METRES
Comdive:    
Communication cable cross Roskilde Fjord
1987
500
   
Danish Railroad Administration:  
Cable pipes (5 x 150 metres) under Oddersund
2003
750
   
Delpro A/S:  
Fibre-optic cable between Langeland and Ærø
2003
5,885
   
Energinet.dk:  
10-ton SA, Storebælt (fibre optic)
2009
32,000
   
ESS Bredbånd:  
Laying fibre optic cable between Als and Jutland in The Als Sound
2006
2,000
   
I/S Nordjyllandsværket:  
Fibre optic cable under Aggersund
2001
550
   
Pirelli Cavi E Sistemi Energis SpA, Italy:  
Fibre optic cable between Ventora Beach and Rødsand Windmill Farm, Denmark
2003
11,500
   
Swedia Network AB:
Cable from Denmark to Sweden
2003
2,111
Cable from Hov to Samsø and Samsø to Røsnæs
2000
38,843
Cable "Danica Nord" from Denmark to Sweden
2000
15,510
Cable from Hov to Samsø and Samsø to Røsnæs
1999
40,000
Two cables from Saxtorp in Sweden to Strandmøllen in Denmark
1999
44,719
 
TDC A/S:
Baltic Sea, Denmark, Repair of Communication cable ID: DK-GER 2
2009
142
Baltic Sea, Germany, Repair of Communication cable
2007
700
Bornholm, Denmark, Repair of Communication cable
2005
200
Communication cable 24LL, Lillebælt
2002
1,500
DISTRICT JUTLAND AND FYN
Electric communication cable from Fyn to Fænø
2001
420
Electric optic cable under Sallingsund
1998
2,100
Electric optic cable under Vilsund
1985
700
Electric optic cable under Oddesund
1994
450
Electric optic cable from Esbjerg to Fanø
1992
5,200
Cable under Aggersund
1991
520
Cable under Mariager Fjord
1990
600
Cable under Limfjorden at Egholm
1986
550
Cable under Limfjorden at Hvalpsund
1994
1,400
Cable under Limfjorden at Fursund
1994
600
DISTRICT SJÆLLAND
Cable system under Roskilde Fjord
1988
1,400
Cable system under Frederikssund
800
 
Tre-For Vand A/S:
Electric optic cable under Lille Bælt
2005
1,150
   
Vestkraft I/S:  
Fibre optic cable under Oddesund
1985
600
   

 