Repair of 250 kV submarine cable between Jutland
and Læsø

The client: Energinet.dk
The place: Kattegat, Denmark
The work: JD-Contractor A/S carried out a repair
of one of the Kontiskan submarine cables between Jutland and Læsø
in May and June 2006. First the diving ship M/S Honte free-jetted
approx. 150 metres of the submarine cable on each side of the damaged
portion. The free-jetted part of the cable was then lifted up from
the seabed and placed next to the trench. When the jetting work
was finished the cable-laying barge C/B Henry P. Lading arrived
to repair the cable. After cutting the cable close to the damaged
portion, the cable ends were taken onboard C/B Henry P. Lading.
Here jointers performed the splicing of the cable.
The following vessels were used during the work:
M/S Honte:
1. Free-jetting the submarine cable.
2. Moving the submarine cable up next to the trench.
C/B Henry P. Lading:
1. Repair of the submarine cable.
Approx. 300 metres of submarine cable were free-jetted
around the site of the damage.
Approx. 50 metres of new submarine cable were laid out into the
seabed.
|